These machines are set up for 460V/60 Hz or 360V/50 Hz operation:
125 HP full load – 142 amps
100 HP full load – 115 amps

Startup >350 amps, even with soft start

Working load 125 HP – 130-135 amps
Working load 100 HP – 108-110 amps

We recommend a 200A breaker. If powered by a generator, we recommend a 150 KW system. Needs to be wired for 3-phase.